TQ Refrigeration were approached by the NEC with a critical task: to decommission, remove, and replace their existing, dilapidated cold rooms.

These cold rooms, located externally from the main building and exposed to the harsh elements, had seen better days. TQ Refrigeration rose to the challenge, devising a comprehensive and meticulously planned programme of works aimed at minimising disruption to the NEC’s daily operations. This detailed plan encompassed the careful dismantling and safe disposal of the old cold room panels, along with the redundant refrigerant gas and associated equipment.

The installation of the new cold rooms was executed with the utmost precision. Every aspect of the process was meticulously managed to ensure the new units were fully weatherproofed and commissioned within the agreed timeframe. The entire project was carried out seamlessly, adhering strictly to the proposed schedule and upholding the highest standards of safety and efficiency.

TQ Refrigeration’s commitment to excellence ensured that the NEC’s cold storage needs were met with minimal disruption, providing a robust and reliable solution for years to come.